← No 1

No 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection and cover plates.

    violationRecord 5090183

    30 CFR 77.512 · $1,320.00 proposed penalty

  2. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5090182

    30 CFR 77.701 · $267.00 proposed penalty

  3. Regular Safety and Health Inspection

    inspectionRecord F02602E

    96.5 on-site hours reported

  4. Electric equipment; examination, testing and maintenance.

    violationRecord 9839768

    30 CFR 75.512 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  5. Short circuit protection of trailing cables.

    violationRecord 9839767

    30 CFR 75.601 · $336.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 9839766

    30 CFR 75.512 · $151.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 9839765

    30 CFR 75.512 · $151.00 proposed penalty

  8. Electric equipment; examination, testing and maintenance.

    violationRecord 9839764

    30 CFR 75.512 · $151.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 9839763

    30 CFR 75.512 · $151.00 proposed penalty

  10. Ventilation controls.

    violationRecord 9839762

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  11. Electric equipment; examination, testing, and maintenance.

    violationRecord 9839760

    30 CFR 77.502 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord F020A40

    43.3 on-site hours reported

  13. Smoking; prohibition.

    violationRecord 9839759

    30 CFR 75.1702 · $151.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9839758

    30 CFR 75.400 · $288.00 proposed penalty

  15. Permissible electric face equipment; maintenance.

    violationRecord 9839757

    30 CFR 75.503 · $193.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 9839756

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  17. Roof control plan.

    violationRecord 9839755

    30 CFR 75.220(a)(1) · $755.00 proposed penalty

  18. Machinery and equipment; operation and maintenance.

    violationRecord 9839754

    30 CFR 77.404(a) · $151.00 proposed penalty

  19. Storage of materials.

    violationRecord 9839753

    30 CFR 77.208(e) · $151.00 proposed penalty

  20. Spot Inspection

    inspectionRecord F020A3E

    7.0 on-site hours reported

  21. Electrical Technical Investigation

    inspectionRecord F00EB1A

    3.0 on-site hours reported

  22. Spot Inspection

    inspectionRecord F020A38

    1.8 on-site hours reported

  23. Mine ventilation plan; submission and approval.

    violationRecord 9839718

    30 CFR 75.370(a)(1)

  24. Mine ventilation plan; submission and approval.

    violationRecord 9839717

    30 CFR 75.370(a)(1) · $184.00 proposed penalty

  25. Construction and repair of seals.

    violationRecord 9838086

    30 CFR 75.337(h) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.