No 1 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(d) · $151.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $313.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 77.1109(c)(1) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $504.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $2,133.00 proposed penalty
On-shift examination.
30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $818.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Slippage and sequence switches.
30 CFR 75.1102 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $226.00 proposed penalty
Frequency of examinations.
30 CFR 75.512-2 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $313.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $549.00 proposed penalty
Map of electrical system.
30 CFR 75.508 · $288.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $1,219.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $549.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $883.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $1,818.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Handling of materials
Perm tot or perm prtl disablty
Accident narrative
Employee stated that while lifting a bag of rock dust, they felt a pain in their lower belly. Work location: Surface supply yard.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.