← No 1

No 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F00E0DA

    12.0 on-site hours reported

  2. Records of certified and qualified persons.

    violationRecord 5132623

    30 CFR 75.159 · $151.00 proposed penalty

  3. Violation — cited standard not reported

    violationRecord 5132616

    $168.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F02EBA0

    21.0 on-site hours reported

  5. Violation — cited standard not reported

    violationRecord 5131055

    $151.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5131054

    30 CFR 77.404(a) · Significant and substantial (S&S) · $267.00 proposed penalty

  7. Flammable liquids; storage.

    violationRecord 5131053

    30 CFR 77.1103(d) · $151.00 proposed penalty

  8. Electric equipment; examination, testing, and maintenance.

    violationRecord 5131052

    30 CFR 77.502 · $177.00 proposed penalty

  9. Examination and maintenance of firefighting equipment.

    violationRecord 5131051

    30 CFR 77.1110 · $151.00 proposed penalty

  10. Emergency tethers.

    violationRecord 5131050

    30 CFR 75.1714-6 · $151.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F02EB9A

    25.3 on-site hours reported

  12. Maintenance of incombustible content of rock dust.

    violationRecord 5093175

    30 CFR 75.403 · $151.00 proposed penalty

  13. Violation — cited standard not reported

    violationRecord 5093174

    $1,153.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5093173

    30 CFR 75.333(h) · Significant and substantial (S&S) · $549.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 5093172

    30 CFR 75.1722(c) · $193.00 proposed penalty

  16. Water requirements.

    violationRecord 5093171

    30 CFR 75.1101-3 · $151.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5093170

    30 CFR 75.1731(a) · $151.00 proposed penalty

  18. Installation of deluge-type sprays.

    violationRecord 5093169

    30 CFR 75.1101-2 · $151.00 proposed penalty

  19. Water requirements.

    violationRecord 5093168

    30 CFR 75.1101-3

  20. Examination and maintenance of firefighting equipment.

    violationRecord 5093167

    30 CFR 77.1110 · $151.00 proposed penalty

  21. Quantity and location of firefighting equipment.

    violationRecord 5093166

    30 CFR 77.1109(a) · $151.00 proposed penalty

  22. Identification of circuit breakers.

    violationRecord 5093165

    30 CFR 75.904 · Significant and substantial (S&S) · $959.00 proposed penalty

  23. Water requirements.

    violationRecord 5093164

    30 CFR 75.1101-3 · $480.00 proposed penalty

  24. Machinery and equipment; operation and maintenance.

    violationRecord 5093163

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $642.00 proposed penalty

  25. Preshift examination at fixed intervals.

    violationRecord 5093162

    30 CFR 75.360(f) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.