← Nelson Quarry & Plant

Nelson Quarry & Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Access to stationary electrical equipment or switchgear.

    violationRecord 5108611

    30 CFR 56.12019

  2. Fixed ladder anchorage and toe clearance.

    violationRecord 5108610

    30 CFR 56.11005

  3. Handrails and toeboards.

    violationRecord 5108609

    30 CFR 56.11002

  4. Safety defects; examination, correction and records.

    violationRecord 5108608

    30 CFR 56.14100(b)

  5. Inspection and cover plates.

    violationRecord 5108033

    30 CFR 56.12032

  6. Parking procedures for unattended equipment.

    violationRecord 5108607

    30 CFR 56.14207

  7. Securing movable parts.

    violationRecord 5108606

    30 CFR 56.14206(b)

  8. Insulation and fittings for power wires and cables.

    violationRecord 5108032

    30 CFR 56.12008

  9. Regular Safety and Health Inspection

    inspectionRecord F03A6CA

    43.8 on-site hours reported

  10. Construction and maintenance of guards.

    violationRecord 5103708

    30 CFR 56.14112(b) · $151.00 proposed penalty

  11. Berms or guardrails.

    violationRecord 5103707

    30 CFR 56.9300(b) · $151.00 proposed penalty

  12. Construction and maintenance of guards.

    violationRecord 5103706

    30 CFR 56.14112(b) · $151.00 proposed penalty

  13. Controls and switches.

    violationRecord 5103261

    30 CFR 56.12002 · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F023EEA

    45.0 on-site hours reported

  15. Slip or fall of person

    accidentRecord 220260490017

    Days restricted activity only

    Accident narrative

    The IE was walking down a flight of steps. On the last one they stepped awkwardly causing them to roll ankle. The X-ray came back negative and the employee was diagnosed with a sprained ankle. A follow up appointment on 2/13 resulted in restrictions.

  16. New task training.

    violationRecord 9686757

    30 CFR 46.7 · Significant and substantial (S&S) · $348.00 proposed penalty

  17. Notification by operator.

    violationRecord 9680158

    30 CFR 41.11(d) · $151.00 proposed penalty

  18. Controls and switches.

    violationRecord 9680157

    30 CFR 56.12002 · $151.00 proposed penalty

  19. Handrails and toeboards.

    violationRecord 9680156

    30 CFR 56.11002 · $151.00 proposed penalty

  20. Inspection and cover plates.

    violationRecord 9680155

    30 CFR 56.12032 · $151.00 proposed penalty

  21. Electrical conductors.

    violationRecord 9680154

    30 CFR 56.12004 · $151.00 proposed penalty

  22. Combustible waste.

    violationRecord 9680153

    30 CFR 56.4104(a) · $151.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 9680152

    30 CFR 56.12008 · $151.00 proposed penalty

  24. Protective equipment or clothing for welding, cutting, or working with molten metal.

    violationRecord 9680151

    30 CFR 56.15007 · $151.00 proposed penalty

  25. Requirement for container labels.

    violationRecord 9686756

    30 CFR 47.41(a) · $165.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.