Neilton Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Electrical conductors.

    violationRecord 9806679

    30 CFR 56.12004 · $151.00 proposed penalty

  2. Correction of dangerous conditions.

    violationRecord 9806678

    30 CFR 56.12030 · $151.00 proposed penalty

  3. Grounding circuit enclosures.

    violationRecord 9806677

    30 CFR 56.12025 · $151.00 proposed penalty

  4. Grounding circuit enclosures.

    violationRecord 9806676

    30 CFR 56.12025 · $151.00 proposed penalty

  5. Electrical conductors.

    violationRecord 9809764

    30 CFR 56.12004 · $151.00 proposed penalty

  6. Protection of persons at switchgear.

    violationRecord 9809763

    30 CFR 56.12020 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  7. Abandoned electric circuits.

    violationRecord 9809762

    30 CFR 56.4011 · $151.00 proposed penalty

  8. Correction of dangerous conditions.

    violationRecord 9809761

    30 CFR 56.12030 · Significant and substantial (S&S) · $366.00 proposed penalty

  9. Electrical conductors.

    violationRecord 9809760

    30 CFR 56.12004 · $151.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 9809759

    30 CFR 56.12032 · $151.00 proposed penalty

  11. Correction of dangerous conditions.

    violationRecord 9809758

    30 CFR 56.12030 · $151.00 proposed penalty

  12. Correction of dangerous conditions.

    violationRecord 9809757

    30 CFR 56.12030 · $151.00 proposed penalty

  13. Controls and switches.

    violationRecord 9809756

    30 CFR 56.12002 · $151.00 proposed penalty

  14. Correction of dangerous conditions.

    violationRecord 9809755

    30 CFR 56.12030 · $151.00 proposed penalty

  15. Insulation and fittings for power wires and cables.

    violationRecord 9809754

    30 CFR 56.12008 · $151.00 proposed penalty

  16. Grounding circuit enclosures.

    violationRecord 9809753

    30 CFR 56.12025 · $151.00 proposed penalty

  17. Grounding circuit enclosures.

    violationRecord 9809752

    30 CFR 56.12025 · Significant and substantial (S&S) · $366.00 proposed penalty

  18. Correction of dangerous conditions.

    violationRecord 9809751

    30 CFR 56.12030 · Significant and substantial (S&S) · $366.00 proposed penalty

  19. Controls and switches.

    violationRecord 9809750

    30 CFR 56.12002 · $151.00 proposed penalty

  20. Protection of gas cylinder valves.

    violationRecord 9806675

    30 CFR 56.16006 · $151.00 proposed penalty

  21. Construction and maintenance of guards.

    violationRecord 9806674

    30 CFR 56.14112(b) · $151.00 proposed penalty

  22. Inspection and cover plates.

    violationRecord 9806673

    30 CFR 56.12032 · $151.00 proposed penalty

  23. Inspection and cover plates.

    violationRecord 9806672

    30 CFR 56.12032 · $151.00 proposed penalty

  24. Correction of dangerous conditions.

    violationRecord 9806671

    30 CFR 56.12030

  25. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 9806670

    30 CFR 56.14130(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.