  1. Construction and maintenance of guards.

    violationRecord 5077902

    30 CFR 56.14112(a)(1) · $432.00 proposed penalty

  2. Housekeeping.

    violationRecord 5077901

    30 CFR 56.20003(a) · $465.00 proposed penalty

  3. Requirements for written safety program.

    violationRecord 5076852

    30 CFR 56.23003(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  4. Gauges and regulators.

    violationRecord 5076851

    30 CFR 56.4602 · $432.00 proposed penalty

  5. Electrical conductors.

    violationRecord 5076850

    30 CFR 56.12004 · $959.00 proposed penalty

  6. Safety defects; examination, correction and records.

    violationRecord 5076848

    30 CFR 56.14100(b) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5074900

    30 CFR 56.14112(a)(1) · $432.00 proposed penalty

  8. Electrical conductors.

    violationRecord 5074899

    30 CFR 56.12004 · $151.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 5074898

    30 CFR 56.14112(a)(1) · $209.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 5074897

    30 CFR 56.14112(a)(1) · $432.00 proposed penalty

  11. Safe access.

    violationRecord 5074896

    30 CFR 56.11001 · $288.00 proposed penalty

  12. Housekeeping.

    violationRecord 5074895

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  13. Correction of dangerous conditions.

    violationRecord 5071284

    30 CFR 56.12030 · Significant and substantial (S&S) · $642.00 proposed penalty

  14. Construction and maintenance of guards.

    violationRecord 5071283

    30 CFR 56.14112(b) · $592.00 proposed penalty

  15. Housekeeping.

    violationRecord 5071282

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  16. Snow and ice on walkways and travelways.

    violationRecord 5071281

    30 CFR 56.11016 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  17. Inspection and cover plates.

    violationRecord 5071280

    30 CFR 56.12032 · $883.00 proposed penalty

  18. Snow and ice on walkways and travelways.

    violationRecord 5076847

    30 CFR 56.11016 · Significant and substantial (S&S) · $151.00 proposed penalty

  19. Identification of power switches.

    violationRecord 5076846

    30 CFR 56.12018 · $697.00 proposed penalty

  20. Inspection.

    violationRecord 5076845

    30 CFR 56.4201(a)(1) · $209.00 proposed penalty

  21. Inspection and cover plates.

    violationRecord 5076844

    30 CFR 56.12032 · $1,550.00 proposed penalty

  22. Construction and maintenance of guards.

    violationRecord 5076843

    30 CFR 56.14112(a) · $697.00 proposed penalty

  23. Housekeeping.

    violationRecord 5074894

    30 CFR 56.20003(b) · $697.00 proposed penalty

  24. Inspection and cover plates.

    violationRecord 5074893

    30 CFR 56.12032 · $1,037.00 proposed penalty

  25. Construction and maintenance of guards.

    violationRecord 5074892

    30 CFR 56.14112(b) · $2,312.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.