NATIONAL CEMENT COMPANY safety activity
MSHA violations, accident reports and inspections.
Safety activity
Verbal Hazard Complaint Inspections
1.5 on-site hours reported
Verbal Hazard Complaint Inspections
3.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Examination of working places.
30 CFR 56.18002(a)(1)
Temporary, portable containers.
30 CFR 47.44(b)
Protection of persons at switchgear.
30 CFR 56.12020 · Significant and substantial (S&S)
Testing grounding systems.
30 CFR 56.12028
Insulation and fittings for power wires and cables.
30 CFR 56.12008
Moving machine parts.
30 CFR 56.14107(a)
Regular Safety and Health Inspection
41.5 on-site hours reported
Housekeeping.
30 CFR 56.20003(c)
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S)
Verbal Hazard Complaint Inspections
9.0 on-site hours reported
Compliance Follow-up Inspection
2.0 on-site hours reported
Handling of materials
Days restricted activity only
Accident narrative
Person reported next day. Lifted a window AC unit and felt a strain. Did not seek medical attention until 08/20/2026. Put on sedentary duty after initial evaluation which resulted in strain of abdominal area.
Safe access.
30 CFR 56.11001 · Significant and substantial (S&S)
Spot Inspection
2.0 on-site hours reported
Verbal Hazard Complaint Inspections
6.5 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 56.14100(a) · Significant and substantial (S&S)
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · $288.00 proposed penalty
Brakes.
30 CFR 56.14101(a)(2) · Significant and substantial (S&S)
Safety defects; examination, correction and records.
30 CFR 56.14100(a) · Significant and substantial (S&S)
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · Significant and substantial (S&S)
Protection of gas cylinder valves.
30 CFR 56.16006 · $592.00 proposed penalty
Verbal Hazard Complaint Inspections
3.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.