← Naselle Quarry

Naselle Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Parking procedures for unattended equipment.

    violationRecord 5160766

    30 CFR 56.14207

  2. Requirement for container labels.

    violationRecord 5160765

    30 CFR 47.41(a)

  3. Electrical conductors.

    violationRecord 5160764

    30 CFR 56.12004

  4. Berms or guardrails.

    violationRecord 5160763

    30 CFR 56.9300(b)

  5. Regular Safety and Health Inspection

    inspectionRecord F03B9BF

    15.5 on-site hours reported

  6. Spot Inspection

    inspectionRecord F0408EC

    0.0 on-site hours reported

  7. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5160036

    30 CFR 50.30(a) · $151.00 proposed penalty

  8. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5160035

    30 CFR 50.30(a) · $151.00 proposed penalty

  9. Impoundment Spot Inspection

    inspectionRecord F040F00

    2.0 on-site hours reported

  10. Warning signs.

    violationRecord 5100366

    30 CFR 56.4101 · $267.00 proposed penalty

  11. Safety defects; examination, correction and records.

    violationRecord 5100365

    30 CFR 56.14100(b) · $267.00 proposed penalty

  12. Safety defects; examination, correction and records.

    violationRecord 5100364

    30 CFR 56.14100(b) · $151.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord F030D0C

    17.3 on-site hours reported

  14. Moving machine parts.

    violationRecord 5100363

    30 CFR 56.14107(a) · $151.00 proposed penalty

  15. Impoundment Spot Inspection

    inspectionRecord F038465

    2.0 on-site hours reported

  16. Safety defects; examination, correction and records.

    violationRecord 5100480

    30 CFR 56.14100(b) · $151.00 proposed penalty

  17. Electrical conductors.

    violationRecord 5100479

    30 CFR 56.12004 · $151.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord F030CEC

    10.5 on-site hours reported

  19. Brakes.

    violationRecord 5100478

    30 CFR 56.14101(a)(2) · Significant and substantial (S&S) · $10,569.00 proposed penalty

  20. Horns and backup alarms.

    violationRecord 5100474

    30 CFR 56.14132(a) · $642.00 proposed penalty

  21. Horns and backup alarms.

    violationRecord 5100473

    30 CFR 56.14132(a) · $642.00 proposed penalty

  22. Moving machine parts.

    violationRecord 5100472

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  23. Safety defects; examination, correction and records.

    violationRecord 5100471

    30 CFR 56.14100(b) · Significant and substantial (S&S) · $959.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 5100470

    30 CFR 56.14100(a) · $193.00 proposed penalty

  25. Safety defects; examination, correction and records.

    violationRecord 5100469

    30 CFR 56.14100(b) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.