  1. Compliance Follow-up Inspection

    inspectionRecord F03A8B5

    4.0 on-site hours reported

  2. Spot Inspection

    inspectionRecord F03A8B1

    6.0 on-site hours reported

  3. Verbal Hazard Complaint Inspections

    inspectionRecord F03A8B0

    8.0 on-site hours reported

  4. Moving machine parts.

    violationRecord 5069906

    30 CFR 56.14107(a) · $151.00 proposed penalty

  5. Machinery, equipment, and tools.

    violationRecord 5069905

    30 CFR 56.14205 · $151.00 proposed penalty

  6. Inspection and cover plates.

    violationRecord 5069904

    30 CFR 56.12032 · $465.00 proposed penalty

  7. Spillage and leakage.

    violationRecord 5069903

    30 CFR 56.4102 · $151.00 proposed penalty

  8. Hand-held power tools.

    violationRecord 9758200

    30 CFR 56.14116(a) · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F027771

    34.5 on-site hours reported

  10. Safe access.

    violationRecord 9709118

    30 CFR 56.11001 · $151.00 proposed penalty

  11. Examination of working places.

    violationRecord 9758191

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $4,871.00 proposed penalty

  12. Safe access.

    violationRecord 9758190

    30 CFR 56.11001 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 9758189

    30 CFR 56.14112(b) · $245.00 proposed penalty

  14. Construction and maintenance of guards.

    violationRecord 9758188

    30 CFR 56.14112(a)(1) · $245.00 proposed penalty

  15. Moving machine parts.

    violationRecord 9758187

    30 CFR 56.14107(a) · $313.00 proposed penalty

  16. Examination of working places.

    violationRecord 9758186

    30 CFR 56.18002(a) · $313.00 proposed penalty

  17. Construction and maintenance of guards.

    violationRecord 9758185

    30 CFR 56.14112(a)(1) · $245.00 proposed penalty

  18. Moving machine parts.

    violationRecord 9758184

    30 CFR 56.14107(a) · $245.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F027763

    60.0 on-site hours reported

  20. Safety procedures for towing.

    violationRecord 5069817

    30 CFR 56.14209(b) · $151.00 proposed penalty

  21. Moving machine parts.

    violationRecord 5069816

    30 CFR 56.14107(a) · $151.00 proposed penalty

  22. Moving machine parts.

    violationRecord 5069815

    30 CFR 56.14107(a) · $151.00 proposed penalty

  23. Electrical conductors.

    violationRecord 5069814

    30 CFR 56.12004 · $151.00 proposed penalty

  24. Stacking and storage of materials.

    violationRecord 5069813

    30 CFR 56.16001 · $151.00 proposed penalty

  25. Electrical conductors.

    violationRecord 5069812

    30 CFR 56.12004 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.