← Muddy Bridge

Muddy Bridge safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Evaluation and revision of roof control plan.

    violationRecord 5092501

    30 CFR 75.223(b)(1) · $151.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5096970

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $10,569.00 proposed penalty

  3. Roof control plan.

    violationRecord 5096969

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5092500

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  5. Other safeguards.

    violationRecord 5099279

    30 CFR 75.1403 · $193.00 proposed penalty

  6. Other safeguards.

    violationRecord 5099278

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  7. Other safeguards.

    violationRecord 5099277

    30 CFR 75.1403 · $193.00 proposed penalty

  8. Other safeguards.

    violationRecord 5099276

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  9. Mechanical equipment guards.

    violationRecord 5099275

    30 CFR 75.1722(a) · $883.00 proposed penalty

  10. Power wires and cables; insulation and protection.

    violationRecord 5099274

    30 CFR 75.517 · $697.00 proposed penalty

  11. Drill dust control at underground areas of underground mines.

    violationRecord 5099273

    30 CFR 72.630(b) · $193.00 proposed penalty

  12. Escapeway maps.

    violationRecord 5099272

    30 CFR 75.1505(b) · $151.00 proposed penalty

  13. Other safeguards.

    violationRecord 5099271

    30 CFR 75.1403 · $193.00 proposed penalty

  14. Power wires and cables; insulation and protection.

    violationRecord 5099270

    30 CFR 75.517 · $697.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 5099269

    30 CFR 75.517 · $1,550.00 proposed penalty

  16. Other safeguards.

    violationRecord 5099268

    30 CFR 75.1403 · $432.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 5099267

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  18. Mechanical equipment guards.

    violationRecord 5099266

    30 CFR 75.1722(c) · $177.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5099265

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  20. Electric equipment; examination, testing and maintenance.

    violationRecord 5099264

    30 CFR 75.512 · $177.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 5099263

    30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  22. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5099262

    30 CFR 75.601-1 · $151.00 proposed penalty

  23. Methane monitors.

    violationRecord 5099261

    30 CFR 75.342(a)(4) · $398.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5099260

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  25. Communications facilities; refuge alternatives.

    violationRecord 5099259

    30 CFR 75.1600-3(a)(1) · $398.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.