Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $151.00 proposed penalty
Handtools (nonpowered)
Days away from work only
Accident narrative
EE was putting miner chain back together with sledge hammer hit EE's left knee with hammer
Regular Safety and Health Inspection
181.5 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Installation of deluge-type sprays.
30 CFR 75.1101-2 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $642.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
13.5 on-site hours reported
Other safeguards.
30 CFR 75.1403
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Mine emergency evacuation training and drills.
30 CFR 75.1504(c) · $697.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $883.00 proposed penalty
Underground electrical installations.
30 CFR 75.340(a)(1)(i) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(b)(1) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(c) · $151.00 proposed penalty
Proximity detection systems.
30 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $883.00 proposed penalty
Guarding of cables.
30 CFR 75.816(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.