Mountaineer II Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escapeway maps.
30 CFR 75.1505(b) · $226.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
30 CFR 75.1714-4(c)(2) · $9,757.00 proposed penalty
Belt air course ventilation.
30 CFR 75.350(a)(2) · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
30 CFR 75.1002(a) · $226.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $1,320.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $177.00 proposed penalty
Spot Inspections
103(i) · 7.5 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $398.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(f)(5)(ii) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $398.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $177.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $465.00 proposed penalty
Verbal Hazard Complaint Inspections
6.3 on-site hours reported
Spot Inspections
103(i) · 6.8 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $193.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
An unplanned roof fall has occurred on the West Mains at 5 crosscut #5 entry.
Non-Injury Accident Investigation
7.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.