← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5090308

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  2. Air quality.

    violationRecord 5090307

    30 CFR 75.321(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9839955

    30 CFR 75.400 · $549.00 proposed penalty

  4. Sampling; general and technical requirements.

    violationRecord 5090306

    30 CFR 71.201(h) · $151.00 proposed penalty

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5090305

    30 CFR 75.512 · $432.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5090304

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  7. Cable fittings; suitability.

    violationRecord 5090303

    30 CFR 75.515 · $336.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 9839612

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $27,603.00 proposed penalty

  9. Rehabilitation of areas with unsupported roof.

    violationRecord 9839611

    30 CFR 75.212(c) · $432.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 9839610

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $27,603.00 proposed penalty

  11. Ventilation controls.

    violationRecord 9839609

    30 CFR 75.333(h) · $336.00 proposed penalty

  12. Spot Inspections

    inspectionRecord 7048312

    103(i) · 7.5 on-site hours reported

  13. Power wires and cables; insulation and protection.

    violationRecord 9838345

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5090302

    30 CFR 75.1731(b) · $165.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5090301

    30 CFR 75.400 · $245.00 proposed penalty

  16. Roof control plan.

    violationRecord 5090300

    30 CFR 75.220(a)(1) · $209.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9837499

    30 CFR 75.400 · $549.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 9837498

    30 CFR 75.400 · $549.00 proposed penalty

  19. Supplemental support materials, equipment and tools.

    violationRecord 9837497

    30 CFR 75.214(a) · $504.00 proposed penalty

  20. Roof control plan.

    violationRecord 9837496

    30 CFR 75.220(a)(1) · $1,818.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F0106DA

    103(i) · 4.8 on-site hours reported

  22. Inspection of fire suppression devices.

    violationRecord 9837495

    30 CFR 75.1107-16(b) · $288.00 proposed penalty

  23. Electric equipment; examination, testing and maintenance.

    violationRecord 9837494

    30 CFR 75.512 · $432.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 9839606

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F0106D8

    103(i) · 6.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.