← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 5095837

    30 CFR 75.333(h) · $366.00 proposed penalty

  2. Spot Inspections

    inspectionRecord 7048977

    103(i) · 11.3 on-site hours reported

  3. Roof testing and scaling.

    violationRecord 5095836

    30 CFR 75.211(d) · $151.00 proposed penalty

  4. Clamping of trailing cables to equipment.

    violationRecord 5095835

    30 CFR 75.605 · $288.00 proposed penalty

  5. Permissible electric face equipment; maintenance.

    violationRecord 5095834

    30 CFR 75.503 · $465.00 proposed penalty

  6. Ventilation controls.

    violationRecord 5095833

    30 CFR 75.333(h) · $366.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 5095832

    30 CFR 75.503 · $465.00 proposed penalty

  8. Electric equipment; examination, testing and maintenance.

    violationRecord 5095831

    30 CFR 75.512 · $432.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5095830

    30 CFR 75.400 · $592.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5095829

    30 CFR 75.400 · $592.00 proposed penalty

  11. Roof control plan.

    violationRecord 5095828

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  12. Ventilation controls.

    violationRecord 9839680

    30 CFR 75.333(d)(3) · $288.00 proposed penalty

  13. Fall of roof or back

    accidentRecord 220253170683

    Accident only

    Accident narrative

    An unplanned roof fall occurred on 2 Gas Mainline 3 section at 38 crosscut, #3 intersection, in the last open break.

  14. Non-Injury Accident Investigation

    inspectionRecord 7049074

    4.0 on-site hours reported

  15. Spot Inspections

    inspectionRecord F0106EB

    103(i) · 5.5 on-site hours reported

  16. Protection from falls of roof, face and ribs.

    violationRecord 9839679

    30 CFR 75.202(a) · $549.00 proposed penalty

  17. Other safeguards.

    violationRecord 9839678

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  18. Weekly examination.

    violationRecord 9839677

    30 CFR 75.364(b)(2) · $1,431.00 proposed penalty

  19. Violation — cited standard not reported

    violationRecord 9837639
  20. Protection from falls of roof, face and ribs.

    violationRecord 9837640

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5096506

    30 CFR 75.400 · $267.00 proposed penalty

  22. Mechanical equipment guards.

    violationRecord 5096505

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  23. Permissible electric face equipment; maintenance.

    violationRecord 5095827

    30 CFR 75.503 · $465.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5095826

    30 CFR 75.517 · Significant and substantial (S&S) · $6,037.00 proposed penalty

  25. Cable fittings; suitability.

    violationRecord 5095825

    30 CFR 75.515 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.