← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5132411

    30 CFR 75.400 · $592.00 proposed penalty

  2. Handling of materials

    accidentRecord 220260550013

    Days away from work only

    Accident narrative

    Employee was helping move cm cable over when they felt pain in their left foot.

  3. Accumulation of combustible materials.

    violationRecord 5098512

    30 CFR 75.400 · $288.00 proposed penalty

  4. Rehabilitation of areas with unsupported roof.

    violationRecord 9839699

    30 CFR 75.212(c) · $959.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5132410

    30 CFR 75.400 · $288.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F0106F4

    103(i) · 3.5 on-site hours reported

  7. Machinery and equipment; operation and maintenance.

    violationRecord 5132409

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5132408

    30 CFR 75.517 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5132407

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5098511

    30 CFR 75.512 · $193.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5098510

    30 CFR 75.517 · $504.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 5098509

    30 CFR 75.517 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  13. Inspection of fire suppression devices.

    violationRecord 5098508

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  14. Roof control plan.

    violationRecord 5098507

    30 CFR 75.220(a)(1) · $697.00 proposed penalty

  15. Ventilation controls.

    violationRecord 5132406

    30 CFR 75.333(c)(1) · $288.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5098506

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5098505

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F00CDCE

    103(i) · 3.0 on-site hours reported

  19. Accumulation of combustible materials.

    violationRecord 5132405

    30 CFR 75.400 · $592.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5132404

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5132403

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5132402

    30 CFR 75.202(a) · $366.00 proposed penalty

  23. Inspection of fire suppression devices.

    violationRecord 5098504

    30 CFR 75.1107-16(b) · Significant and substantial (S&S) · $697.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5132401

    30 CFR 75.517 · $504.00 proposed penalty

  25. Drill dust control at underground areas of underground mines.

    violationRecord 5132400

    30 CFR 72.630(b) · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.