Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5133455

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 5133454

    30 CFR 75.202(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5132836

    30 CFR 75.517 · $366.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F005E8C

    103(i) · 6.5 on-site hours reported

  5. Permissible electric face equipment; maintenance.

    violationRecord 5133453

    30 CFR 75.503 · $398.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5133452

    30 CFR 75.400 · $432.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5133451

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5133450

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5133449

    30 CFR 75.400 · $193.00 proposed penalty

  10. Handling of materials

    accidentRecord 220262020010

    Days away from work only

    Accident narrative

    Employee was removing a rub rail from a continuous mining machine when the rub rail came down on top of the employee's left foot.

  11. Verbal Hazard Complaint Inspections

    inspectionRecord F008573

    4.5 on-site hours reported

  12. Protection from falls of roof, face and ribs.

    violationRecord 5132835

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5133448

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5133447

    30 CFR 75.400 · $432.00 proposed penalty

  15. Drill dust control at underground areas of underground mines.

    violationRecord 5133446

    30 CFR 72.630(b) · $366.00 proposed penalty

  16. Identification of circuit breakers.

    violationRecord 5132834

    30 CFR 75.904 · $336.00 proposed penalty

  17. Escapeway maps.

    violationRecord 5132833

    30 CFR 75.1505(b) · $151.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5133445

    30 CFR 75.503 · $366.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5133444

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F005E89

    103(i) · 7.0 on-site hours reported

  21. Automatic fire warning devices; actions and response.

    violationRecord 5097308

    30 CFR 75.1103-5(a)(1) · $151.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5133443

    30 CFR 75.400 · $193.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5133442

    30 CFR 75.400 · $432.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5133441

    30 CFR 75.512 · $151.00 proposed penalty

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5133440

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.