Roof control plan.
30 CFR 75.220(a)(1) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $226.00 proposed penalty
Roof Control Technical Investigation
8.0 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(f)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $226.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $432.00 proposed penalty
Refuge alternatives.
30 CFR 75.1506(g) · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $288.00 proposed penalty
Roof Control Technical Investigation
17.0 on-site hours reported
Electric equipment other than power-connection points; outby the last open crosscut; return air; permissibility requirements.
30 CFR 75.507-1(a) · $226.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $226.00 proposed penalty
Ventilation Technical Investigation
37.0 on-site hours reported
Regular Safety and Health Inspection
206.5 on-site hours reported
Non-Injury Accident Investigation
8.5 on-site hours reported
Fall of roof or back
Accident only
Accident narrative
An unplanned and reportable roof fall was discovered in the #4 entry at 172 break F-Mains intake/track. There were no injuries, no property damage, and the ventilation system was not disrupted. This occurrence was immediately reported.
Short circuit protection; ratings and settings of circuit breakers.
30 CFR 75.601-1 · $226.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $226.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $226.00 proposed penalty
Roof Control Technical Investigation
15.0 on-site hours reported
Electrical Technical Investigation
12.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.