← Mountain Loop Mine

Mountain Loop Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F049856

    0.5 on-site hours reported

  2. Action level.

    violationRecord 5107821

    30 CFR 62.120 · $267.00 proposed penalty

  3. Horns and backup alarms.

    violationRecord 5107820

    30 CFR 56.14132(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  4. Correction of dangerous conditions.

    violationRecord 5107819

    30 CFR 56.12030 · Significant and substantial (S&S) · $398.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 5107818

    30 CFR 56.14100(b) · $177.00 proposed penalty

  6. Safety defects; examination, correction and records.

    violationRecord 5107817

    30 CFR 56.14100(b) · $151.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5107816

    30 CFR 56.14100(b) · $177.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 5107815

    30 CFR 56.14100(b) · $177.00 proposed penalty

  9. Electrical conductors.

    violationRecord 5107814

    30 CFR 56.12004 · $151.00 proposed penalty

  10. Housekeeping.

    violationRecord 5107813

    30 CFR 56.20003(a) · $177.00 proposed penalty

  11. Moving machine parts.

    violationRecord 5107812

    30 CFR 56.14107(a) · $267.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord F03D390

    16.5 on-site hours reported

  13. Spot Inspection

    inspectionRecord F03D36D

    1.8 on-site hours reported

  14. Requirement for an MSDS.

    violationRecord 5107315

    30 CFR 47.51(b) · $151.00 proposed penalty

  15. Examination of working places.

    violationRecord 5107314

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  16. Annual refresher training.

    violationRecord 5107313

    30 CFR 46.8(a)(2) · $168.00 proposed penalty

  17. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5107305

    30 CFR 50.30(a) · $151.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord F03D362

    15.8 on-site hours reported

  19. Housekeeping.

    violationRecord 9505842

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  20. Requirement for container labels.

    violationRecord 5107312

    30 CFR 47.41(a) · $151.00 proposed penalty

  21. Horns and backup alarms.

    violationRecord 5107311

    30 CFR 56.14132(a) · $151.00 proposed penalty

  22. Machinery, equipment, and tools.

    violationRecord 5107310

    30 CFR 56.14205 · $151.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 5107309

    30 CFR 56.12008 · $151.00 proposed penalty

  24. Moving machine parts.

    violationRecord 5107308

    30 CFR 56.14107(a) · $151.00 proposed penalty

  25. Protection for openings around travelways.

    violationRecord 5107307

    30 CFR 56.11012 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.