Electrical conductors.
30 CFR 56.12004 · $209.00 proposed penalty
Striking or bumping
No dys awy frm wrk,no rstr act
Accident narrative
A plant employee was walking up the ramp to the 700 belt to inspect the grinding aid flow. While ducking under one of the newly installed beams for the weigh feeder, the employee raised their head and struck forehead on the second beam. The impact caused their safety glasses to shift and cut deeply on their forehead.
Regular Safety and Health Inspection
77.5 on-site hours reported
Barricades and warning signs.
30 CFR 56.20011 · $193.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
9.3 on-site hours reported
Electrical conductors.
30 CFR 56.12004 · $313.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $313.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was shoveling material from underneath a conveyer in the Finish Mill area when EE felt discomfort in EE's lower back.
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
A dust collector mechanic was changing out filter bags for a cement silo dust collector and after a two hour period noticed an eye irritation. The employee stopped work and flushed eyes multiple times but needed off-site assistance from a medical care facility.
Compliance Follow-up Inspection
10.5 on-site hours reported
Exposure limits for airborne contaminants.
30 CFR 56.5001(a)/56.5005 · Significant and substantial (S&S) · $959.00 proposed penalty
Horns and backup alarms.
30 CFR 56.14132(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Snow and ice on walkways and travelways.
30 CFR 56.11016 · Significant and substantial (S&S) · $697.00 proposed penalty
Moving machine parts.
30 CFR 56.14107 · $193.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $151.00 proposed penalty
Heat sources.
30 CFR 56.4500 · $151.00 proposed penalty
Machinery, equipment, and tools.
30 CFR 56.14205 · $432.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · Significant and substantial (S&S) · $642.00 proposed penalty
Safe access.
30 CFR 56.11001 · $151.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $226.00 proposed penalty
Spillage and leakage.
30 CFR 56.4102 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Handrails and toeboards.
30 CFR 56.11002 · $151.00 proposed penalty
Training plan implementation.
30 CFR 46.4(a)(2) · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.