Mosby Quarry safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspection
1.8 on-site hours reported
Escape and evacuation plans.
30 CFR 57.11053 · $151.00 proposed penalty
Ventilation plan.
30 CFR 57.8520 · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 57.14112(a)(1) · $151.00 proposed penalty
Horns and backup alarms for surface equipment.
30 CFR 57.14132(b)(1)(i) · $151.00 proposed penalty
Moving machine parts.
30 CFR 57.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
21.8 on-site hours reported
Impoundment Spot Inspection
2.3 on-site hours reported
Spot Inspection
8.3 on-site hours reported
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S)
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S)
Examination of working places.
30 CFR 57.18002(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Examination of working places.
30 CFR 57.18002(b) · $432.00 proposed penalty
Examination of working places.
30 CFR 57.18002(a) · Significant and substantial (S&S) · $27,603.00 proposed penalty
Fall of roof or back
Dys awy frm wrk & restrctd act
Accident narrative
Miner was loading the heading of decline project when a section of shale from the roof fell striking EE in the basket of the Anfo Loader.
Non-Fatal Accident Investigation
46.0 on-site hours reported
Violation — cited standard not reported
Spot Inspection
2.3 on-site hours reported
Records of training.
30 CFR 48.9(a) · $151.00 proposed penalty
Equipment and maintenance requirements.
30 CFR 49.6(b) · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $755.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a)(1) · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · Significant and substantial (S&S) · $226.00 proposed penalty
Moving machine parts.
30 CFR 57.14107(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.