Morton Salt Fairport Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Hoisting
Accident only
Accident narrative
Hoist operator couldn't get the production hoist to move making it unavailable for travel.
Hoisting
Accident only
Accident narrative
Smoke was observed coming from the West motor in the production hoist house. Management decided to evacuate and shut the hoist down for inspection.
Hoisting
Accident only
Accident narrative
Power lost due to storms causing the production hoist to be unavailable.
Hoisting
Accident only
Accident narrative
NDT results indicated the service hoist ropes met retirement criteria.
Hoisting
Accident only
Accident narrative
Electrical connection to the hoist failed causing the hoist to be inoperable.
Verbal Hazard Complaint Inspections
3.8 on-site hours reported
Maximum riders in a conveyance.
30 CFR 57.19066 · $151.00 proposed penalty
Two-way communication equipment for underground operations.
30 CFR 57.20032 · $151.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 57.14207 · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Controls and switches.
30 CFR 57.12002 · $151.00 proposed penalty
Combustible waste.
30 CFR 57.4104(a) · $151.00 proposed penalty
Correction of dangerous conditions.
30 CFR 57.12030 · $151.00 proposed penalty
Combustible waste.
30 CFR 57.4104(b) · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $245.00 proposed penalty
Hoisting
Accident only
Accident narrative
Utility power outage caused the production hoist to be unavailable.
Regular Safety and Health Inspection
73.0 on-site hours reported
Hoisting
Accident only
Accident narrative
Utility power outage caused the production hoist to be unavailable.
Hoisting
Accident only
Accident narrative
The hoist operator reported the hoist was inoperable.
Hoisting
Accident only
Accident narrative
While operating hoist in automatic mode, the hoist stopped and the operator couldn't get the hoist to move.
Hoisting
Accident only
Accident narrative
While performing rope NDT, rope met retirement criteria.
Underground self-propelled equipment.
30 CFR 57.4260(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
49.3 on-site hours reported
Correction of hazardous conditions.
30 CFR 57.3200 · $151.00 proposed penalty
Temporary, portable containers.
30 CFR 47.44(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.