← MORRIS DREDGE AND PLANT

MORRIS DREDGE AND PLANT safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9768166

    30 CFR 50.30(a) · $151.00 proposed penalty

  2. Fuel lines.

    violationRecord 9768165

    30 CFR 56.4501 · $151.00 proposed penalty

  3. First-aid materials.

    violationRecord 9768164

    30 CFR 56.15001 · $151.00 proposed penalty

  4. Handrails and toeboards.

    violationRecord 9768163

    30 CFR 56.11002 · $151.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F042EA1

    11.0 on-site hours reported

  6. Regular Safety and Health Inspection

    inspectionRecord F02246C

    4.5 on-site hours reported

  7. Insulation and fittings for power wires and cables.

    violationRecord 9760794

    30 CFR 56.12008 · $151.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord F00975C

    2.0 on-site hours reported

  9. Safety can use.

    violationRecord 9760440

    30 CFR 56.4402 · $151.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F0163BB

    1.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.