Safety activity

  1. Access to stationary electrical equipment or switchgear.

    violationRecord 5245020

    30 CFR 56.12019

  2. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5166759

    30 CFR 50.30(a)

  3. General requirements.

    violationRecord 5166758

    30 CFR 56.4200(a)(2)

  4. Combustible waste.

    violationRecord 5166757

    30 CFR 56.4104(b)

  5. Splices and repairs of power cables.

    violationRecord 5245019

    30 CFR 56.12013(b)

  6. Moving machine parts.

    violationRecord 5166756

    30 CFR 56.14107(a)

  7. Regular Safety and Health Inspection

    inspectionRecord F030FB7

    0.0 on-site hours reported

  8. Safe access.

    violationRecord 5166755

    30 CFR 56.11001 · Significant and substantial (S&S)

  9. Moving machine parts.

    violationRecord 5166754

    30 CFR 56.14107(a) · Significant and substantial (S&S)

  10. Inspection and cover plates.

    violationRecord 5166753

    30 CFR 56.12032

  11. Examination of working places.

    violationRecord 5166752

    30 CFR 56.18002(b) · Significant and substantial (S&S)

  12. Housekeeping.

    violationRecord 5166751

    30 CFR 56.20003(a)

  13. Spot Inspection

    inspectionRecord F02C182

    0.0 on-site hours reported

  14. Working alone.

    violationRecord 5165293

    30 CFR 56.18020 · $209.00 proposed penalty

  15. Entrapment

    accidentRecord 220261730024

    Accident only

    Accident narrative

    Elevator stopped between floors with two miners on board.

  16. Handling of materials

    accidentRecord 220261730022

    All other cases (incl 1st aid)

    Accident narrative

    Miner was on foot scouting a new drill pattern. EE bent to pick up EE's wheel chocks and felt a muscle pull in EE's back muscles.

  17. Construction and maintenance of guards.

    violationRecord 5166272

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  18. Safety belts and lines.

    violationRecord 5166646

    30 CFR 56.15005 · Significant and substantial (S&S) · $959.00 proposed penalty

  19. Safety can use.

    violationRecord 5166271

    30 CFR 56.4402 · $151.00 proposed penalty

  20. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5166270

    30 CFR 50.30(a) · $151.00 proposed penalty

  21. Electrical conductors.

    violationRecord 5166645

    30 CFR 56.12004 · $193.00 proposed penalty

  22. Requirement for container labels.

    violationRecord 5166269

    30 CFR 47.41(a) · $151.00 proposed penalty

  23. Inspection and cover plates.

    violationRecord 5166644

    30 CFR 56.12032 · $151.00 proposed penalty

  24. Inspection and cover plates.

    violationRecord 5166268

    30 CFR 56.12032 · $151.00 proposed penalty

  25. Inspection.

    violationRecord 5166267

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.