  1. Regular Safety and Health Inspection

    inspectionRecord F031038

    10.0 on-site hours reported

  2. Electrical conductors.

    violationRecord 5003331

    30 CFR 56.12004 · $1,037.00 proposed penalty

  3. Regular Safety and Health Inspection

    inspectionRecord F02982E

    9.0 on-site hours reported

  4. Regular Safety and Health Inspection

    inspectionRecord F027910

    8.0 on-site hours reported

  5. Inspection and cover plates.

    violationRecord 5005028

    30 CFR 56.12032 · $151.00 proposed penalty

  6. Splices and repairs of power cables.

    violationRecord 5005027

    30 CFR 56.12013(b) · $366.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5005026

    30 CFR 56.14112(a)(1) · $165.00 proposed penalty

  8. Requirement for an MSDS.

    violationRecord 9799236

    30 CFR 47.51(b) · $151.00 proposed penalty

  9. Records of training.

    violationRecord 9799235

    30 CFR 46.9(d)(1) · $151.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord 6936157

    13.5 on-site hours reported

  11. Verbal Hazard Complaint Inspections

    inspectionRecord 6936158

    0.3 on-site hours reported

  12. Housekeeping.

    violationRecord 9799234

    30 CFR 56.20003(a) · $151.00 proposed penalty

  13. Flying or falling materials.

    violationRecord 9799233

    30 CFR 56.14110 · $151.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 9799232

    30 CFR 56.14100(b) · $151.00 proposed penalty

  15. Inspection and cover plates.

    violationRecord 9799231

    30 CFR 56.12032 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.