← MISSION/SAN XAVIER/EISENHOWER

MISSION/SAN XAVIER/EISENHOWER safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spillage and leakage.

    violationRecord 5033290

    30 CFR 56.4102 · $193.00 proposed penalty

  2. Circuit overload protection.

    violationRecord 9733041

    30 CFR 56.12001 · Significant and substantial (S&S) · $959.00 proposed penalty

  3. Correction of dangerous conditions.

    violationRecord 9733040

    30 CFR 56.12030 · $193.00 proposed penalty

  4. Safety defects; examination, correction and records.

    violationRecord 5033287

    30 CFR 56.14100(a) · $193.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 5033286

    30 CFR 56.14100(b) · $193.00 proposed penalty

  6. Safety defects; examination, correction and records.

    violationRecord 5033285

    30 CFR 56.14100(b) · $193.00 proposed penalty

  7. Insulation and fittings for power wires and cables.

    violationRecord 9733039

    30 CFR 56.12008 · $398.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 9733038

    30 CFR 56.14100(b) · $193.00 proposed penalty

  9. Inspection and cover plates.

    violationRecord 5059381

    30 CFR 56.12032 · $193.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5052200

    30 CFR 56.12032 · $193.00 proposed penalty

  11. Spillage and leakage.

    violationRecord 5033284

    30 CFR 56.4102 · $193.00 proposed penalty

  12. Safety defects; examination, correction and records.

    violationRecord 5033283

    30 CFR 56.14100(b) · $193.00 proposed penalty

  13. Safety defects; examination, correction and records.

    violationRecord 5033282

    30 CFR 56.14100(b) · $151.00 proposed penalty

  14. Inspection.

    violationRecord 5033281

    30 CFR 56.4201(a)(3) · $151.00 proposed penalty

  15. Impoundment Spot Inspection

    inspectionRecord F00480F

    3.0 on-site hours reported

  16. Correction of dangerous conditions.

    violationRecord 9733037

    30 CFR 56.12030 · $226.00 proposed penalty

  17. Testing grounding systems.

    violationRecord 9733036

    30 CFR 56.12028 · $226.00 proposed penalty

  18. Insulation and fittings for power wires and cables.

    violationRecord 9733035

    30 CFR 56.12008 · $209.00 proposed penalty

  19. Safety defects; examination, correction and records.

    violationRecord 5033280

    30 CFR 56.14100(b) · $755.00 proposed penalty

  20. Correction of dangerous conditions.

    violationRecord 5033279

    30 CFR 56.12030 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  21. Testing grounding systems.

    violationRecord 5033278

    30 CFR 56.12028 · $226.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 5033277

    30 CFR 56.14100(b) · $226.00 proposed penalty

  23. First-aid materials.

    violationRecord 5033276

    30 CFR 56.15001 · $226.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 5033275

    30 CFR 56.14100(a) · $226.00 proposed penalty

  25. Safety defects; examination, correction and records.

    violationRecord 5033274

    30 CFR 56.14100(b) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.