Miss Linda Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Horns and backup alarms for surface equipment.
30 CFR 57.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
42.5 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Equipment and maintenance requirements.
30 CFR 49.6(a)(6) · $245.00 proposed penalty
Distribution boxes.
30 CFR 57.12006 · $151.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
On June 2, 2025, an employee was assisting with the installation of a packer intended to control a high-volume, high-pressure water leak at the mine face. During the operation, the employee began stepping back and turning, the employee twisted EE's right knee.
Regular Safety and Health Inspection
47.0 on-site hours reported
Spot Inspection
3.5 on-site hours reported
Moving machine parts.
30 CFR 57.14107(a) · $151.00 proposed penalty
Hazard training.
30 CFR 48.11(a) · Significant and substantial (S&S) · $233.00 proposed penalty
Regular Safety and Health Inspection
33.5 on-site hours reported
Correction of dangerous conditions.
30 CFR 57.12030 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.