← Minntac Plant

Minntac Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Housekeeping.

    violationRecord 6502133

    30 CFR 56.20003(b) · $883.00 proposed penalty

  2. Housekeeping.

    violationRecord 6502132

    30 CFR 56.20003(c) · $432.00 proposed penalty

  3. Housekeeping.

    violationRecord 8669800

    30 CFR 56.20003(b) · $883.00 proposed penalty

  4. Housekeeping.

    violationRecord 8669799

    30 CFR 56.20003(a) · $642.00 proposed penalty

  5. Correction of dangerous conditions.

    violationRecord 8669798

    30 CFR 56.12030 · $1,126.00 proposed penalty

  6. Testing grounding systems.

    violationRecord 6502131

    30 CFR 56.12028 · $1,219.00 proposed penalty

  7. Requirement for container labels.

    violationRecord 6502130

    30 CFR 47.41(a)(1) · $193.00 proposed penalty

  8. Testing grounding systems.

    violationRecord 6502129

    30 CFR 56.12028 · $1,219.00 proposed penalty

  9. Testing grounding systems.

    violationRecord 8669797

    30 CFR 56.12028 · $151.00 proposed penalty

  10. Correction of dangerous conditions.

    violationRecord 8669796

    30 CFR 56.12030 · $1,126.00 proposed penalty

  11. Housekeeping.

    violationRecord 8669795

    30 CFR 56.20003(a) · $642.00 proposed penalty

  12. Testing grounding systems.

    violationRecord 8669794

    30 CFR 56.12028 · $1,219.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 8669793

    30 CFR 56.14112(b) · $288.00 proposed penalty

  14. Housekeeping.

    violationRecord 8669792

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  15. Testing grounding systems.

    violationRecord 8669791

    30 CFR 56.12028 · $1,219.00 proposed penalty

  16. Stationary grinding machines.

    violationRecord 8669790

    30 CFR 56.14115(b) · $193.00 proposed penalty

  17. Housekeeping.

    violationRecord 8669789

    30 CFR 56.20003(b) · $1,126.00 proposed penalty

  18. Testing grounding systems.

    violationRecord 8669788

    30 CFR 56.12028 · $1,550.00 proposed penalty

  19. Housekeeping.

    violationRecord 8669787

    30 CFR 56.20003(b) · $1,126.00 proposed penalty

  20. Housekeeping.

    violationRecord 8669786

    30 CFR 56.20003(b) · $1,126.00 proposed penalty

  21. Snow and ice on walkways and travelways.

    violationRecord 8669785

    30 CFR 56.11016 · $245.00 proposed penalty

  22. Testing grounding systems.

    violationRecord 8669784

    30 CFR 56.12028 · $1,550.00 proposed penalty

  23. Testing grounding systems.

    violationRecord 8669783

    30 CFR 56.12028 · $1,550.00 proposed penalty

  24. Handling of materials

    accidentRecord 220252060024

    Days away from work only

    Accident narrative

    When doing alignment for the fan motor the rotor has to be spun. Employee was moving the rotor manually by pushing on the fan blades and felt pain in the right shoulder. THIS INCIDENT BECAME A RECORDABLE ON 7/24/25 WHEN THE EMPLOYEE RECEIVED RESTRICTIONS UPON SURGERY.

  25. Testing grounding systems.

    violationRecord 8669782

    30 CFR 56.12028 · $1,550.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.