Mine No 5 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2(e) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · $151.00 proposed penalty
High-voltage underground equipment; grounding.
30 CFR 75.811 · $151.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $288.00 proposed penalty
Violation — cited standard not reported
$168.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Regular Safety and Health Inspection
222.5 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S) · $177.00 proposed penalty
Approved sampling devices; maintenance and calibration.
30 CFR 70.204(d) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $959.00 proposed penalty
Ventilation controls.
30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(2) · $697.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · Significant and substantial (S&S) · $366.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.