MINE NO. 1 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(f) · $193.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
1.5 on-site hours reported
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(a) · $193.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Was removing a shield leg jack when the jack swung around and hit EE's right ankle, catching both legs between the cell plate the shield foot.
Spot Inspections
103(i) · 3.8 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(a)(8) · $165.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(i) · $165.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
Walking across the 650 duckbill to grab cribs for relay bar. EE stepped off the duckbill into a hole and twisted EE's left ankle.
Multi-gas detectors.
30 CFR 75.1714-7(a) · $165.00 proposed penalty
Spot Inspections
103(i) · 7.8 on-site hours reported
Spot Inspections
103(i) · 3.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $193.00 proposed penalty
Insulating mats at power switches.
30 CFR 77.513 · $193.00 proposed penalty
Switchboards; passageways and clearance.
30 CFR 77.514 · $193.00 proposed penalty
Switchboards; passageways and clearance.
30 CFR 77.514 · $193.00 proposed penalty
Insulating mats at power switches.
30 CFR 77.513 · $193.00 proposed penalty
Spot Inspections
103(i) · 2.8 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
12.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.