MINE NO. 1 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 6.3 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $193.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Spot Inspections
103(i) · 3.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(i) · $193.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Handtools (nonpowered)
Perm tot or perm prtl disablty
Accident narrative
While changing the intermass jack on the #411 Roofbolter, they removed the top jack pin and had a long punch holding the top eye of the jack. They removed the bottom jack pin, as they were trying to remove the jack it slipped causing left pinky finger to be pinched between the stem and the eye of the jack.
Spot Inspections
103(i) · 4.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Belt air course ventilation.
30 CFR 75.350(a)(2) · $193.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
1.5 on-site hours reported
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
While roof bolting operator's pusher steel cross threaded in the drill chuck. Operator attempted to dislodge the drill steel, the drill steel was bent, the steel kicked back striking operator in the hardhat causing a laceration. Operator received stitches.
Hoisting
Accident only
Accident narrative
During examination of the Slope Hoist rope, a distortion was found on the rope at the 220 foot mark behind the Brakeman Car. Upon further investigation a faulty rope roller was found at the Slope Turnout at the 220 foot area off the mine bottom.
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
While cutting a can of glue, knife slipped and cut left index finger, causing them to receive 3 stitches.
Slip or fall of person
All other cases (incl 1st aid)
Accident narrative
As EE stood up getting off the mantrip, EE felt a sharp pain in EE's right knee. EE went to take a step and EE's knee failed causing EE to fall to the ground.
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(i) · $549.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(b)(4) · $193.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(b)(4) · $193.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $883.00 proposed penalty
Spot Inspections
103(i) · 4.0 on-site hours reported
Mine tracks.
30 CFR 75.508-1 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.