Dry chemical devices; capacity; minimum requirements.
30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $151.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $818.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $1,431.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(v) · $1,431.00 proposed penalty
Smoking; prohibition.
30 CFR 75.1702 · $245.00 proposed penalty
Regular Safety and Health Inspection
59.8 on-site hours reported
Immediate notification.
30 CFR 50.10(a) · $7,555.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
There was a Non-Injury Roof Fall which occurred at this mine in which was found on 09/29/2025 at the intersection of #5 Entry. The Roof Fall must have happened over the weekend while the workers were off.
Fall of roof or back
Accident only
Accident narrative
There was a Non-Injury Roof Fall which occurred at this mine in which was found on 09/30/2025. The Roof Fall must have happened overnight while the workers were off.
Non-Injury Accident Investigation
76.3 on-site hours reported
Rehabilitation of areas with unsupported roof.
30 CFR 75.212(c) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $17,082.00 proposed penalty
Violation — cited standard not reported
Violation — cited standard not reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(a) · $151.00 proposed penalty
Violation — cited standard not reported
$480.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Transformers; installation and guarding.
30 CFR 77.509(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.