← Mine #2

Mine #2 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspection

    inspectionRecord F008EB9

    2.0 on-site hours reported

  2. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F00361E

    1.0 on-site hours reported

  3. Spot Inspection

    inspectionRecord F003619

    1.5 on-site hours reported

  4. Regular Safety and Health Inspection

    inspectionRecord F004FF9

    1.0 on-site hours reported

  5. Spot Inspection

    inspectionRecord F02956F

    1.0 on-site hours reported

  6. Criteria—MSHA Form 7000-1, Section C.

    violationRecord 9270735

    30 CFR 50.20-6 · $151.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 9270734

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 9879064

    30 CFR 75.202(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 9270733

    30 CFR 75.512 · $151.00 proposed penalty

  10. Roof control plan.

    violationRecord 9270732

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  11. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 9270731

    30 CFR 75.601-1 · $151.00 proposed penalty

  12. Power wires; support.

    violationRecord 9270730

    30 CFR 75.516 · $151.00 proposed penalty

  13. Warning devices.

    violationRecord 9270729

    30 CFR 75.208 · Significant and substantial (S&S) · $245.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 9270728

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  15. Roof control plan.

    violationRecord 9270727

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $818.00 proposed penalty

  16. Transformers; installation and guarding.

    violationRecord 9270726

    30 CFR 77.509(c) · $818.00 proposed penalty

  17. Examination and maintenance of firefighting equipment.

    violationRecord 9270725

    30 CFR 77.1110 · $151.00 proposed penalty

  18. Inspection and cover plates.

    violationRecord 9270724

    30 CFR 77.512 · $245.00 proposed penalty

  19. Mine emergency evacuation training and drills.

    violationRecord 9270723

    30 CFR 75.1504(b)(3)(i) · $151.00 proposed penalty

  20. First-aid equipment; location; minimum requirements.

    violationRecord 9270721

    30 CFR 75.1713-7(c) · $151.00 proposed penalty

  21. Escapeway maps.

    violationRecord 9270720

    30 CFR 75.1505(b) · $366.00 proposed penalty

  22. Methane monitors.

    violationRecord 9270719

    30 CFR 75.342(a)(4) · $165.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9270722

    30 CFR 75.202(a)

  24. Fall of roof or back

    accidentRecord 220253170505

    Accident only

    Accident narrative

    There was a Non Injury Roof Fall which was found on 10/29/2025. The Roof Fall was one break inby the miner between #1 and #2 entries.

  25. Protection from falls of roof, face and ribs.

    violationRecord 9270718

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,355.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.