MIMBRES PIT safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F03DE5B

    0.0 on-site hours reported

  2. Brakes.

    violationRecord 5173900

    30 CFR 56.14101(a)(3) · Significant and substantial (S&S)

  3. Moving machine parts.

    violationRecord 5173899

    30 CFR 56.14107(a)

  4. Regular Safety and Health Inspection

    inspectionRecord F038CEC

    5.5 on-site hours reported

  5. Records of training.

    violationRecord 5009984

    30 CFR 46.9(c)(3) · $151.00 proposed penalty

  6. Insulation and fittings for power wires and cables.

    violationRecord 5009983

    30 CFR 56.12008 · $642.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5009982

    30 CFR 56.14112(a)(1) · $288.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5009981

    30 CFR 56.14107(a) · $288.00 proposed penalty

  9. Changes; notification by operator.

    violationRecord 5009880

    30 CFR 41.12 · $151.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F038B4B

    4.5 on-site hours reported

  11. Newly hired experienced miner training.

    violationRecord 5009879

    30 CFR 46.6(a) · $193.00 proposed penalty

  12. Records of training.

    violationRecord 5009878

    30 CFR 46.9(a) · $151.00 proposed penalty

  13. Insulation and fittings for power wires and cables.

    violationRecord 5009877

    30 CFR 56.12008 · $193.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 9799981

    30 CFR 56.14100(a) · $642.00 proposed penalty

  15. Brakes.

    violationRecord 9799980

    30 CFR 56.14101(a)(2) · $642.00 proposed penalty

  16. Regular Safety and Health Inspection

    inspectionRecord F017179

    12.0 on-site hours reported

  17. Insulation and fittings for power wires and cables.

    violationRecord 9799979

    30 CFR 56.12008 · $193.00 proposed penalty

  18. Construction and maintenance of guards.

    violationRecord 9799978

    30 CFR 56.14112(a)(1) · $288.00 proposed penalty

  19. Safe access.

    violationRecord 9799977

    30 CFR 56.11001 · Significant and substantial (S&S) · $959.00 proposed penalty

  20. Construction and maintenance of guards.

    violationRecord 9799976

    30 CFR 56.14112(a)(1) · $288.00 proposed penalty

  21. Construction and maintenance of ladders.

    violationRecord 9799975

    30 CFR 56.11003 · $193.00 proposed penalty

  22. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9678709

    30 CFR 50.30(a) · $151.00 proposed penalty

  23. Requirement for container labels.

    violationRecord 9678708

    30 CFR 47.41(a)(1) · $151.00 proposed penalty

  24. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 9678707

    30 CFR 56.14130(a)(2) · Significant and substantial (S&S) · $193.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord 6934351

    5.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.