Mill/Autoclave Operations safety activity
MSHA violations, accident reports and inspections.
Safety activity
Inspection and cover plates.
30 CFR 56.12032 · $313.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty
Barricades and warning signs.
30 CFR 56.20011 · $504.00 proposed penalty
Storage of incompatible substances.
30 CFR 56.16012 · Significant and substantial (S&S) · $8,315.00 proposed penalty
Stationary grinding machines.
30 CFR 56.14115(b) · $465.00 proposed penalty
Storage of incompatible substances.
30 CFR 56.16012 · $1,037.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Illumination of surface working areas.
30 CFR 56.17001 · $313.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $313.00 proposed penalty
Battery-charging stations.
30 CFR 56.4502(c) · $1,037.00 proposed penalty
Moving machine parts.
30 CFR 56.14107 · $313.00 proposed penalty
Construction and maintenance of ladders.
30 CFR 56.11003 · $313.00 proposed penalty
Machinery, equipment, and tools.
30 CFR 56.14205 · $313.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $1,126.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $313.00 proposed penalty
Battery-charging stations.
30 CFR 56.4502(c) · $313.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $313.00 proposed penalty
Barricades and warning signs.
30 CFR 56.20011 · $465.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $366.00 proposed penalty
Combustible waste.
30 CFR 56.4104(a) · $366.00 proposed penalty
Controls and switches.
30 CFR 56.12002 · $549.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $366.00 proposed penalty
Securing gas cylinders.
30 CFR 56.16005 · $366.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $549.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.