Mill 6 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Safe access.
30 CFR 56.11001
Stacking and storage of materials.
30 CFR 56.16001
Warning signs.
30 CFR 56.4101
General requirements.
30 CFR 56.4200(b)(2)
Regular Safety and Health Inspection
2.5 on-site hours reported
Other
No dys awy frm wrk,no rstr act
Accident narrative
Paramedic contractor noted swelling and pain to right elbow after waking up on 8/22/26 at Station 1. Swelling reduced after three days to allow for straightening of arm. Located bite marks on elbow after work shift had been completed. Medications prescribed by doctor for reduction of swelling and infection control.
First-aid materials.
30 CFR 56.15001 · $818.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $1,818.00 proposed penalty
Regular Safety and Health Inspection
32.3 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · $1,037.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · $1,037.00 proposed penalty
Illumination of surface working areas.
30 CFR 56.17001 · $1,037.00 proposed penalty
Illumination of surface working areas.
30 CFR 56.17001 · $1,037.00 proposed penalty
Horns and backup alarms.
30 CFR 56.14132(a) · $1,037.00 proposed penalty
Horns and backup alarms.
30 CFR 56.14132(a) · $1,037.00 proposed penalty
Handtools (nonpowered)
Days restricted activity only
Accident narrative
EE using hammer to loosen a bull hose from cam fitting. Other EE assisting and pulling on bull hose. Bull hose released unexpectedly while the EE was swinging hammer, and their thumb was pinched between the two pound hammer and the cam fitting. At ER, thumb nail was removed and one suture placed in nail bed. Small fracture at tip of thumb. EE released to restricted duty.
Compliance Follow-up Inspection
2.0 on-site hours reported
Storage of hazardous materials.
30 CFR 56.16003 · $151.00 proposed penalty
Storage facilities.
30 CFR 56.4430(a)(2) · $151.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $209.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $209.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $151.00 proposed penalty
Protective equipment and clothing for hazards and irritants.
30 CFR 56.15006 · $151.00 proposed penalty
Danger signs.
30 CFR 56.12021 · $818.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.