← Miami Cement Plant

Miami Cement Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. New miner training.

    violationRecord 5062907

    30 CFR 46.5(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  2. Testing grounding systems.

    violationRecord 5062906

    30 CFR 56.12028 · $151.00 proposed penalty

  3. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F016049

    22.0 on-site hours reported

  4. Machinery, equipment, and tools.

    violationRecord 9705988

    30 CFR 56.14205 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  5. Housekeeping.

    violationRecord 9705981

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  6. Electrical conductors.

    violationRecord 9705980

    30 CFR 56.12004 · $151.00 proposed penalty

  7. Safe access.

    violationRecord 9705979

    30 CFR 56.11001 · $432.00 proposed penalty

  8. Housekeeping.

    violationRecord 9705978

    30 CFR 56.20003(a) · $465.00 proposed penalty

  9. Safe access.

    violationRecord 9705977

    30 CFR 56.11001 · $151.00 proposed penalty

  10. Housekeeping.

    violationRecord 9705976

    30 CFR 56.20003(a) · $465.00 proposed penalty

  11. Self-propelled equipment.

    violationRecord 9705975

    30 CFR 56.4230(c) · $151.00 proposed penalty

  12. Electrical conductors.

    violationRecord 9705974

    30 CFR 56.12004 · Significant and substantial (S&S) · $959.00 proposed penalty

  13. Safety defects; examination, correction and records.

    violationRecord 9705973

    30 CFR 56.14100(b) · $151.00 proposed penalty

  14. Protection of gas cylinder valves.

    violationRecord 9705972

    30 CFR 56.16006 · $151.00 proposed penalty

  15. Moving machine parts.

    violationRecord 5062905

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 5062904

    30 CFR 56.14112(a)(1) · $193.00 proposed penalty

  17. Housekeeping.

    violationRecord 5062903

    30 CFR 56.20003(a) · $465.00 proposed penalty

  18. Inspection and cover plates.

    violationRecord 5062902

    30 CFR 56.12032 · $151.00 proposed penalty

  19. Housekeeping.

    violationRecord 5062901

    30 CFR 56.20003(a) · $465.00 proposed penalty

  20. Housekeeping.

    violationRecord 5062900

    30 CFR 56.20003(a) · $465.00 proposed penalty

  21. Combustible waste.

    violationRecord 5062899

    30 CFR 56.4104(b) · $151.00 proposed penalty

  22. Correction of dangerous conditions.

    violationRecord 5062898

    30 CFR 56.12030 · $151.00 proposed penalty

  23. Safety belts and lines.

    violationRecord 5062897

    30 CFR 56.15005 · Significant and substantial (S&S) · $959.00 proposed penalty

  24. New task training.

    violationRecord 5062896

    30 CFR 46.7(a) · $168.00 proposed penalty

  25. Electrical conductors.

    violationRecord 9825524

    30 CFR 56.12004 · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.