Meikle Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Magazine requirements.
30 CFR 57.6132
Separation of transported explosive material.
30 CFR 57.6201(b)(2) · $432.00 proposed penalty
Magazine requirements.
30 CFR 57.6132 · $432.00 proposed penalty
Underground self-propelled equipment.
30 CFR 57.4260(c) · $432.00 proposed penalty
Handling of materials
Dys awy frm wrk & restrctd act
Accident narrative
EE lifting/pulling 3ft 6in pipe weighing 50lbs from rack. They felt tendon pop in left arm, and immediate pain. Seen at ER, diagnosis complete lt. bicep tear, released with restrictions. Seen at clinic, referred for MRI and ortho consult.
Verbal Hazard Complaint Inspections
2.0 on-site hours reported
Spot Inspection
1.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
5.0 on-site hours reported
Correction of hazardous conditions.
30 CFR 57.3200 · $642.00 proposed penalty
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
EE was sitting in cab of haul truck. They put their middle finger in the hole of the A/C vent and their finger was cut by the fan. Seen at ER, diagnosed with laceration to the right middle finger and put on restrictions that do not preclude full duty.
Disorders (repeated trauma)
Occupatnal illness not deg 1-6
Accident narrative
Ee sustained a Standard Threshold Shift in hearing. Confirmed reportable noise induced hearing loss. Occupational exposures could not be ruled out. Confirmation received from, Au.D. CPS/A, on 06/01/26. Retraining and refitting complete.
Compliance Follow-up Inspection
13.0 on-site hours reported
Ground support use.
30 CFR 57.3360 · $1,126.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $642.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313 · $366.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313 · $1,219.00 proposed penalty
Inspection and cover plates.
30 CFR 57.12032 · Significant and substantial (S&S) · $11,450.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $642.00 proposed penalty
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $18,504.00 proposed penalty
Escape routes.
30 CFR 57.11051(a) · $366.00 proposed penalty
Escape routes.
30 CFR 57.11051(a) · $165.00 proposed penalty
Safe access.
30 CFR 57.11001 · $313.00 proposed penalty
Barricades and warning signs.
30 CFR 57.20011 · $697.00 proposed penalty
General requirements.
30 CFR 57.4200(b)(2) · $165.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.