Meadow Branch safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspection
15.3 on-site hours reported
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · $504.00 proposed penalty
Spot Inspection
16.5 on-site hours reported
Mine map.
30 CFR 77.1200 · $151.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · Significant and substantial (S&S)
Verbal Hazard Complaint Inspections
23.5 on-site hours reported
Loading and haulage equipment; installations.
30 CFR 77.1605(a)
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c)
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $245.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(c) · $151.00 proposed penalty
Sanitary toilet facilities at surface work sites; installation requirements.
30 CFR 71.500(a) · $151.00 proposed penalty
Drinking water; general.
30 CFR 71.600 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $267.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · Significant and substantial (S&S) · $1,467.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(a) · $168.00 proposed penalty
Independent contractor register.
30 CFR 45.4(b) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $288.00 proposed penalty
Storage of materials.
30 CFR 77.208(d) · $151.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · Significant and substantial (S&S) · $504.00 proposed penalty
Cable fittings; suitability.
30 CFR 77.505 · $151.00 proposed penalty
Approved methods of grounding of equipment receiving power from ungrounded alternating current power systems.
30 CFR 77.701-1(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.