  1. Construction and maintenance of guards.

    violationRecord 5002986

    30 CFR 56.14112(a)(1) · $642.00 proposed penalty

  2. Spillage and leakage.

    violationRecord 5002985

    30 CFR 56.4102 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  3. Spillage and leakage.

    violationRecord 5002984

    30 CFR 56.4102 · $2,133.00 proposed penalty

  4. Spillage and leakage.

    violationRecord 5002983

    30 CFR 56.4102 · $642.00 proposed penalty

  5. Housekeeping.

    violationRecord 9795745

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  6. Access to stationary electrical equipment or switchgear.

    violationRecord 9795744

    30 CFR 56.12019 · $288.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 9795743

    30 CFR 56.14100(b) · $288.00 proposed penalty

  8. Electrical conductors.

    violationRecord 9795742

    30 CFR 56.12004 · $288.00 proposed penalty

  9. Insulation and fittings for power wires and cables.

    violationRecord 9795741

    30 CFR 56.12008 · $288.00 proposed penalty

  10. Barricades and warning signs.

    violationRecord 9795740

    30 CFR 56.20011 · $288.00 proposed penalty

  11. Locking transformer enclosures.

    violationRecord 9795739

    30 CFR 56.12068 · $959.00 proposed penalty

  12. Housekeeping.

    violationRecord 9795738

    30 CFR 56.20003(a) · $1,037.00 proposed penalty

  13. Housekeeping.

    violationRecord 9795737

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  14. Housekeeping.

    violationRecord 5005632

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  15. Protection for openings around travelways.

    violationRecord 5005631

    30 CFR 56.11012 · $288.00 proposed penalty

  16. Inspection.

    violationRecord 5005630

    30 CFR 56.4201(a)(2) · $288.00 proposed penalty

  17. Safe access.

    violationRecord 5005629

    30 CFR 56.11001 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  18. Taglines, hitches, and slings.

    violationRecord 5005628

    30 CFR 56.16007(b) · $959.00 proposed penalty

  19. First-aid materials.

    violationRecord 5004134

    30 CFR 56.15001 · $432.00 proposed penalty

  20. Machinery, equipment, and tools.

    violationRecord 5004133

    30 CFR 56.14205 · $432.00 proposed penalty

  21. Safe access.

    violationRecord 5004132

    30 CFR 56.11001 · $288.00 proposed penalty

  22. Electrical conductors.

    violationRecord 5004131

    30 CFR 56.12004 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 5004130

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  24. Barricades and warning signs.

    violationRecord 5004129

    30 CFR 56.20011 · $288.00 proposed penalty

  25. Inspection.

    violationRecord 5004128

    30 CFR 56.4201(a)(1) · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.