  1. Housekeeping.

    violationRecord 9882853

    30 CFR 56.20003(a) · $4,383.00 proposed penalty

  2. Housekeeping.

    violationRecord 9879108

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  3. Pit or quarry wall perimeter.

    violationRecord 9879107

    30 CFR 56.3131 · $336.00 proposed penalty

  4. Non-Injury Accident Investigation

    inspectionRecord F006016

    11.5 on-site hours reported

  5. Machinery, equipment, and tools.

    violationRecord 9882836

    30 CFR 56.14205 · $193.00 proposed penalty

  6. Machinery, equipment, and tools.

    violationRecord 9882835

    30 CFR 56.14205 · $151.00 proposed penalty

  7. Machinery

    accidentRecord 220250640002

    No dys awy frm wrk,no rstr act

    Accident narrative

    EE was using grinder with a grinding disc. The grinder kicked back cutting EE's knuckle on EE's right hand.

  8. Safety defects; examination, correction and records.

    violationRecord 9882821

    30 CFR 56.14100(c) · $642.00 proposed penalty

  9. Housekeeping.

    violationRecord 9882820

    30 CFR 56.20003(a) · $697.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 9882819

    30 CFR 56.14112(b) · $755.00 proposed penalty

  11. Examination of working places.

    violationRecord 9882818

    30 CFR 56.18002 · Significant and substantial (S&S) · $959.00 proposed penalty

  12. Barricades and warning signs.

    violationRecord 9882817

    30 CFR 56.20011 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 9882816

    30 CFR 56.14112(b) · $755.00 proposed penalty

  14. Housekeeping.

    violationRecord 9882815

    30 CFR 56.20003(a) · $1,550.00 proposed penalty

  15. Housekeeping.

    violationRecord 9882814

    30 CFR 56.20003(a) · $1,550.00 proposed penalty

  16. Inspection.

    violationRecord 9882813

    30 CFR 56.4201(a)(1) · $267.00 proposed penalty

  17. Inspection.

    violationRecord 9882812

    30 CFR 56.4201(a)(1) · $267.00 proposed penalty

  18. Inspection.

    violationRecord 9882811

    30 CFR 56.4201(a)(1) · $267.00 proposed penalty

  19. Inspection.

    violationRecord 9882810

    30 CFR 56.4201(a)(1) · $267.00 proposed penalty

  20. Extinguisher recharging or replacement.

    violationRecord 8286295

    30 CFR 56.4203 · $151.00 proposed penalty

  21. Inspection and cover plates.

    violationRecord 8284107

    30 CFR 56.12032 · $883.00 proposed penalty

  22. Roadway maintenance.

    violationRecord 8284106

    30 CFR 56.9313 · $267.00 proposed penalty

  23. Exits.

    violationRecord 8284105

    30 CFR 56.4530 · $267.00 proposed penalty

  24. Moving machine parts.

    violationRecord 8284104

    30 CFR 56.14107(a) · $398.00 proposed penalty

  25. Moving machine parts.

    violationRecord 8284103

    30 CFR 56.14107(a) · $398.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.