MARSHALL COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $165.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(v) · $366.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was lifting straps off the miner with gloves on when a strap cut EE's finger. PPE was not a factor, mining system was not a factor, compliance with rules and regulations was not a factor.
103 (g) Written Notification Hazard Complaint Inspectio
13.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $165.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Warning devices.
30 CFR 75.208 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Underground electrical installations.
30 CFR 75.340(a)(1)(i) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,126.00 proposed penalty
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Employee was using z drill when steel came down and hit EE's arm. PPE was not a factor, mining system was not a factor, compliance with rules and regulations was not a factor.
Handling of materials
Days away from work only
Accident narrative
Employee was carrying supplies to the miner when EE felt pop in right calf muscle. PPE was not a factor, mining system was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
103(i) · 8.0 on-site hours reported
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $267.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
30 CFR 75.363(b) · $549.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $165.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $245.00 proposed penalty
Dust accumulations in surface installations.
30 CFR 77.202 · $245.00 proposed penalty
Storage of materials.
30 CFR 77.208(e) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.