MARSHALL COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Ventilation controls.
30 CFR 75.333(d)(3) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $336.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $165.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $465.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $313.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $313.00 proposed penalty
Non-Injury Accident Investigation
5.0 on-site hours reported
Fall of roof or back
Accident only
Accident narrative
An unplanned roof fall occurred on 07/26/2025 at approx 11:15 am on 5 North #2 belt at 45xc. The roof fall measured approx 16'W x 121'H x 70' L. The fall was dangered off on all sides and will be cleaned up.
Handling of materials
Days away from work only
Accident narrative
Employee was hanging miner cable and water line onto roller hanger when they felt pop in the middle of their back. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Health Technical Investigation
7.5 on-site hours reported
Sampling; general and technical requirements.
30 CFR 70.201(i) · $151.00 proposed penalty
Non-Injury Accident Investigation
6.0 on-site hours reported
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $313.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $226.00 proposed penalty
Criteria—Haulage; general.
30 CFR 75.1403-10(e) · $151.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
30 CFR 75.601-1 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was attempting to lower pipe from the rib line. The EE let the pipe down to fast and injured EE's left ribs. The cause of this incident was improper body mechanics. PPE was not a factor, mining systems was not a factor, compliance with rules and regs was not a factor, miner proficiency was a factor
Slip or fall of person
Days away from work only
Accident narrative
Employee was attempting to assist to move power center cars. Employee was walking into the track spur and slipped, tripped and fell over a piece of pipe. The cause of this incident was improper body mechanics. PPE was not a factor, mining systems was not a factor, compliance with rules and regs was not a factor, miner proficiency was a factor.
Fall of roof or back
Accident only
Accident narrative
At approx 2:57am on 7/23/25 an unplanned roof fall occurred at 15-17xc on the haulage. The roof fall measured approx 16'w x 10'h x 40'l. The fall was dangered off on all side and will be cleaned up.
Spot Inspections
103(i) · 7.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.