MARSHALL COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $226.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $465.00 proposed penalty
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Employee was removing old belt structure when left index finger was caught between the top of the new frame and an old bottom roller.
Handling of materials
Days away from work only
Accident narrative
Employee was removing structure to build drive, when a piece of bed rail fell and struck EE's foot. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Fall of roof or back
Accident only
Accident narrative
An unplanned roof fall occurred on 11/21/25 at 3:10PM at 56-57 xc #1 entry. The fall length was undetermined at the time of the fall. The fall was dangered off and will be cleaned up and bolted.
Health Technical Investigation
9.0 on-site hours reported
Dust accumulations in surface installations.
30 CFR 77.202 · $209.00 proposed penalty
Falling/sliding/rolling materials
Days away from work only
Accident narrative
Employee was helping unload short sticks of rail at shanty when one rail rolled and pinched finger in between another short stick. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Electrical Technical Investigation
15.0 on-site hours reported
Testing, examination and maintenance.
30 CFR 75.821(d) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $398.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Verbal Hazard Complaint Inspections
3.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Underground electrical installations.
30 CFR 75.340(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $6,041.00 proposed penalty
Health Technical Investigation
18.8 on-site hours reported
Spot Inspections
103(i) · 5.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.