103 (g) Written Notification Hazard Complaint Inspectio
5.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
5.0 on-site hours reported
Preshift examination at fixed intervals.
30 CFR 75.360(b)(11)(iii) · $1,037.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $2,712.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(4) · $313.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(4) · $151.00 proposed penalty
Fall of roof or back
Days away from work only
Accident narrative
Employee was working on LW face at 12 shield when rock came over handrail and struck the back of their leg. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Handling of materials
Days away from work only
Accident narrative
Employee was helping hang miner cable and water line into a roller hanger when they felt pop in their upper arm (bicep). PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
103(i) · 8.5 on-site hours reported
Ventilation controls.
30 CFR 75.333(h) · $432.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $313.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $209.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $465.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(b)(11)(i) · $313.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · $151.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $465.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $9,004.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $165.00 proposed penalty
Handtools (nonpowered)
Days away from work only
Accident narrative
Employee was working on a cable repair when knife slipped and cut their finger, causing them to receive stitches. PPE was a factor, mining systems was a factor, compliance with rules and regulations was not a factor.
Methane monitors.
30 CFR 75.342(a)(4) · $592.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.