MARSHALL COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Other safeguards.
30 CFR 75.1403 · $226.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(cc) · $209.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $226.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(b) · $151.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $165.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $366.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $313.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $209.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $165.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $226.00 proposed penalty
Fall of roof or back
No dys awy frm wrk,no rstr act
Accident narrative
Employee was working on air lock doors when a rock fell from roof and struck EE's lip. PPE was not an issue, mining systems was not an issue, compliance with rules and regulations was not an issue.
Handling of materials
Days away from work only
Accident narrative
Employee was helping unload structure from scoop when EE dropped structure on EE's foot. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Handling of materials
Days away from work only
Accident narrative
Employee was putting supplies on miner when EE picked up a rib strap when it cut through EE's glove. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Handling of materials
Days away from work only
Accident narrative
Employee was bolting when the pusher steel slipped out of EE's hands and hit EE on the head. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Electrical Technical Investigation
39.0 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $313.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was pulling shuttle car slack to hang when EE felt pain on the right side of EE's chest. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Machinery
Days away from work only
Accident narrative
Employee was center bolting when EE was reaching for plate and EE's finger got caught in drill guide. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.