Criteria—Haulage; general.
30 CFR 75.1403-10(e) · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400
Other safeguards.
30 CFR 75.1403 · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Handtools (nonpowered)
Days away from work only
Accident narrative
Employee was placing a tire back onto the scoop when the come-along chain being used to assist with the installation broke, causing the tire to fall onto the employee's legs. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Surface installations; general.
30 CFR 77.200 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · $245.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was placing the tire back onto the scoop when the tire slipped off the axle and landed on the employee's foot and ankle. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Stepping or kneeling on object
Days away from work only
Accident narrative
Employee was stepping off the bumper of the miner when EE stepped onto a large piece of coal, causing EE's ankle to roll.
Spot Inspections
103(i) · 9.0 on-site hours reported
Escapeway maps.
30 CFR 75.1505(a)(1) · $4,047.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $177.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $642.00 proposed penalty
Emergency tethers.
30 CFR 75.1714-6 · $465.00 proposed penalty
Violation — cited standard not reported
$517.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Violation — cited standard not reported
$658.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.