MARSHALL COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Other safeguards.
30 CFR 75.1403 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $3,022.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · Significant and substantial (S&S) · $6,194.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $33,227.00 proposed penalty
Health Technical Investigation
6.8 on-site hours reported
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Employee was shoveling the 9 Belt Take-up when right hand contacted the Take-up rail resulting in a cut to EE's hand. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Health Technical Investigation
10.0 on-site hours reported
Violation — cited standard not reported
$1,467.00 proposed penalty
Verbal Hazard Complaint Inspections
7.5 on-site hours reported
Violation — cited standard not reported
$2,782.00 proposed penalty
Violation — cited standard not reported
$1,252.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $313.00 proposed penalty
Fall of roof or back
Days away from work only
Accident narrative
Employee was rib pinning when a rock fell from the top and struck the employee in the hard hat and on both shoulders. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
103(i) · 8.0 on-site hours reported
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Weekly examination.
30 CFR 75.364(a)(1) · $313.00 proposed penalty
Spot Inspections
103(i) · 3.0 on-site hours reported
Verbal Hazard Complaint Inspections
3.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $177.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(e) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.