MARSHALL COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mechanical equipment guards.
30 CFR 77.400(a) · $465.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $177.00 proposed penalty
Fall of roof or back
Days away from work only
Accident narrative
Employee was rib pinning when a rock fell from the top and struck employee in the hard hat and left arm. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
103(i) · 7.0 on-site hours reported
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
6.0 on-site hours reported
Roof Control Technical Investigation
45.5 on-site hours reported
Non-Injury Accident Investigation
6.0 on-site hours reported
Fall of roof or back
Accident only
Accident narrative
An unplanned roof fall occurred on 7/07/2026 at 12:48pm. The fall measured 16' wide by 40' long by 10' high. The fall occurred on Mainline 10 Track at 10-21 crosscut, track to neutral. The area was posted on all sides, dangered off, and will be cleaned up.
Non-Injury Accident Investigation
7.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $209.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $504.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(4) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $226.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $883.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $177.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
3.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.