Marion County Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $313.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee strained left hip installing a top roller into structure on a 7W belt advance on 5/5/25, did not report injury until 5/8/25 when they went to seek medical attention and missed one day of work for a muscle strain. No problems with equipment or compliance issues, training or PPE.
Spot Inspections
103(i) · 8.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $313.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Powered haulage
No dys awy frm wrk,no rstr act
Accident narrative
Injured was hooking a chain onto a roll of belt inby 10 belt take up to be moved by the belt winder when another employee accidentally hit the lever of the belt winder causing the chain to tighten and catch the injured right pinky between the chain resulting in a distal tuft fracture. No problems with equipment, compliance issues, training or PPE.
Verbal Hazard Complaint Inspections
7.0 on-site hours reported
Disorders (repeated trauma)
Occupatnal illness not deg 1-6
Accident narrative
The mine received a Self-Insured Employer Decision on 4/29/25 from a medical report dated 3/24/25 identifying a 7.97% permanent partial disability from noise-induced hearing loss. The miner retired on 4/2/25
Ventilation controls.
30 CFR 75.333(h) · $165.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Powered haulage
Days away from work only
Accident narrative
While pulling fuel buffalo with 24 ton diesel motor through 118 1/4 block 9 south haulage they heard a noise like the buffalo went off track. Without stopping they turned back to look at the buffalo and struck their hard hat off a roof strap, resulting in an injury/aggravation to cervical spine. No problems with equipment or compliance issues, training or PPE
Health Technical Investigation
51.8 on-site hours reported
Spot Inspections
103(i) · 9.3 on-site hours reported
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $226.00 proposed penalty
Rock dusting.
30 CFR 75.402 · $313.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(e)(2) · $209.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $1,126.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.