Marion County Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $465.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $2,312.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Injured was walking through personnel door at 83 block St Leo (track to belt) and shut EE's left hand in the door resulting in an open fracture of the distal phalange to EE's left middle finger and minor lacerations to index. Was wearing gloves. No problems with equipment or compliance issues, training, or PPE.
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $209.00 proposed penalty
Spot Inspections
103(i) · 9.8 on-site hours reported
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Injured installing rib bolt with 3' metal rib strap off right side of miner 41 block 1-2 crosscut 7W when the strap rotated from vertical towards horizontal and while trying to catch it, it struck EE's right wrist resulting in a laceration. Bolt was not rotating at time. No problem with equipment or compliance issues, training or PPE.
Spot Inspections
103(i) · 7.3 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $209.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $313.00 proposed penalty
Inundation
Accident only
Accident narrative
Gas inundation occurred while cutting through SC-6 CBM well on 7 West section #2 entry near 41 block. Horizontal well bore was larger than anticipated and the mine had to acquire larger packers to plug the well. Methane levels were over 1.5% for more than 15 minutes after ventilation was established. No problems with equipment or compliance issues, training or PPE.
Non-Injury Accident Investigation
17.5 on-site hours reported
Non-Injury Accident Investigation
18.8 on-site hours reported
Violation — cited standard not reported
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $642.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $313.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
Unplanned roof fall discovered reportable 23 block intersection Main West Haulage. Fall approximately 8' high, 15' long and 16'wide. Separation appears to be mostly along clay intrusion lines, area mined in 1967. No problems with equipment or compliance issues, training or PPE.
Spot Inspections
103(i) · 7.3 on-site hours reported
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(b) · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $313.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.